| Electronic Components Datasheet Search |
|
AD7450ARMZ Datasheet(PDF) 17 Page - Analog Devices |
|
|
|||||||||||||||||||||||||||||
AD7450ARMZ Datasheet(HTML) 17 Page - Analog Devices |
|
17 / 22 page ![]() AD7450 –17– CS THREE-STATE SDATA 12 10 SCLK Figure 22. Entering Power-Down Mode Once CS has been brought high in this window of SCLKs, the part will enter power-down, the conversion that was initiated by the falling edge of CS will be terminated, and SDATA will go back into three-state. The time from the rising edge of CS to SDATA three-state enabled will never be greater than t8 (see Timing Specifications). If CS is brought high before the second SCLK falling edge, the part will remain in normal mode and will not power down. This will avoid accidental power-down due to glitches on the CS line. To exit this mode of operation and power the AD7450 up again, a dummy conversion is performed. On the falling edge of CS, the device will begin to power up and continue to power up as long as CS is held low until after the falling edge of the 10th SCLK. The device will be fully powered up after 1 µs has elapsed and, as shown in Figure 23, valid data will result from the next conversion. If CS is brought high before the 10th falling edge of SCLK, the AD7450 will again go back into power-down. This avoids accidental power-up due to glitches on the CS line or an inadvertent burst of eight SCLK cycles while CS is low. So although the device may begin to power up on the falling edge of CS, it will again power down on the rising edge of CS as long as it occurs before the 10th SCLK falling edge. Power-Up Time The power-up time of the AD7450 is typically 1 µs, which means that with any frequency of SCLK up to 18 MHz, one dummy cycle will always be sufficient to allow the device to power up. Once the dummy cycle is complete, the ADC will be fully powered up and the input signal will be acquired properly. The quiet time, tQUIET, must still be allowed from the point at which the bus goes back into three-state after the dummy conversion to the next falling edge of CS. When running at the maximum throughput rate of 1 MSPS, the AD7450 will power up and acquire a signal within ±0.5 LSB in one dummy cycle, i.e., 1 µs. When powering up from the power-down mode with a dummy cycle, as in Figure 23, the track-and-hold, which was in hold mode while the part was powered down, returns to track mode after the first SCLK edge the part receives after the falling edge of CS. This is shown as Point A in Figure 23. Although at any SCLK frequency one dummy cycle is sufficient to power the device up and acquire VIN, it does not necessarily mean that a full dummy cycle of 16 SCLKs must always elapse to power up the device and acquire VIN fully; 1 µs will be sufficient to power the device up and acquire the input signal. For example, if a 5 MHz SCLK frequency was applied to the ADC, the cycle time would be 3.2 µs (i.e., 1/(5 MHz) 16). In one dummy cycle, 3.2 µs, the part would be powered up and VIN acquired fully. However, after 1 µs with a 5 MHz SCLK, only 5 SCLK cycles would have elapsed. At this stage, the ADC would be fully powered up and the signal acquired. So, in this case, the CS can be brought high after the 10th SCLK falling edge and brought low again after a time, tQUIET, to initiate the conversion. When power supplies are first applied to the AD7450, the ADC may either power up in the power-down mode or normal mode. Because of this, it is best to allow a dummy cycle to elapse to ensure the part is fully powered up before attempting a valid conversion. Likewise, if the user wishes the part to power up in power-down mode, then the dummy cycle may be used to ensure the device is in power-down by executing a cycle such as that shown in Figure 22. Once supplies are applied to the AD7450, the power-up time is the same as that when powering up from the power-down mode. It takes approximately 1 µs to power up fully if the part powers up in normal mode. It is not necessary to wait 1 µs before executing a dummy cycle to ensure the desired mode of operation. Instead, the dummy cycle can occur directly after power is supplied to the ADC. If the first valid conversion is then performed directly after the dummy conversion, care must be taken to ensure that adequate acquisition time has been allowed. As mentioned earlier, when powering up from the power-down mode, the part will return to track upon the first SCLK edge applied after the falling edge of CS. However, when the ADC powers up initially after supplies are applied, the track-and-hold will already be in track. This means if (assuming one has the facility to monitor the ADC supply current) the ADC powers up in the desired mode of operation, and thus a dummy cycle is not required to change the mode, then a dummy cycle is not required to place the track-and-hold into track. SDATA CS INVALID DATA SCLK 116 VALID DATA 1 A THE PART BEGINS TO POWER UP THE PART IS FULLY POWERED UP WITH V IN FULLY ACQUIRED 10 10 16 t POWER-UP Figure 23. Exiting Power-Down Mode Rev. A |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |