| Electronic Components Datasheet Search |
|
BCM20705 Datasheet(PDF) 28 Page - Cypress Semiconductor |
|
|
|||||||||||||||||||||||||||||
BCM20705 Datasheet(HTML) 28 Page - Cypress Semiconductor |
|
28 / 67 page ![]() One-Time Programmable Memory BCM20705 Data Sheet BROADCOM CONFIDENTIAL Broadcom® Bluetooth Transceiver and Baseband Processor November 13, 2014 • MCS20705-DS104-R Page 27 Contents The following are typical parameters programmed into the OTP memory: •BD_ADDR • Software license key • USB PID/VID • USB bus/self-powered status • Output power calibration • Frequency trimming • Initial status LED drive configuration The OTP contents also include a static error correction table to improve yield during the programming process as well as forward error correction codes to eliminate any long-term reliability problems. The OTP contents associated with error correction are not visible by customers. Programming OTP memory programming takes place through a combination of Broadcom software integrated with the manufacturing test software and code embedded in BCM20705 firmware. Programming the OTP requires a 3.3V supply. The OTP programming supply comes from the VDD_USB pin. For applications where the OTP is most useful, such as the USB transport application for the PC market, the 3.3V is already required for USB operation from the VDD_USB pin. The OTP power supply is allowed to be as low as 1.8 V to be able to read the contents. See Table 2 for the OTP memory programming supply voltage requirements. The OTP is enabled by default by setting OTP_DIS to low using an internal pull-down resistor. Leave this pin floating for a default configuration. To disable the OTP, set the OTP_DIS pin to active high. This pin can be configured from the HW to enable or disable OTP. Typically it won’t be necessary to disable the OTP memory, even if it is not programmed during manufacturing. The OTP_DIS package ball only needs to be tied to high if recommended by Broadcom. Table 2: OTP Programming Supply Voltage Requirementsa a. The average and peak current consumptions during OTP memory programming are 20 mA and 70 mA, respectively. Supply Minimumb b. Contact your Broadcom representative for recommended minimum and maximum supply voltages. Typical Maximumb Unit VDD_USB TBD TBD TBD V |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |